Enterprise & Colocation Data Centers
- Utility service and switchgear
- 2N and N+1 redundant UPS systems
- Generator and ATS infrastructure
- PDU installation and branch circuit design
- Cooling system power coordination
- Structured cabling and low-voltage
Enterprise · Colocation · Edge · AI/ML Compute
Our co-founder's early career started in commercial electrical construction — then a private tour of a carrier data center changed the direction. He went on to run technology departments and found SaaS companies on infrastructure he designed himself. We know what the load on the other side of the breaker is doing.
Our Experience
Our co-founder's background in electrical construction gave him ground-level experience in how facilities actually get built. A pivotal moment was a private three-hour Verizon data center tour guided by the head of facilities — a deep technical immersion into every critical system: redundant UPS infrastructure, HVAC, power distribution, and failover architecture.
Then the servers started humming — and the direction changed. He moved into IT, ran technology departments, and founded multiple SaaS companies, including ones running self-healing Kubernetes pipelines on infrastructure he designed. That is the perspective we bring to critical power: both sides of the failure.
Primary Specialty
A power event in a data center doesn't just turn off a light. It can corrupt in-flight writes, violate SLAs, trigger cascading failures across distributed systems, and cost thousands of dollars per minute in downtime. We design with uptime as the baseline requirement.
Redundant power paths from the utility entrance through the UPS, ATS, and PDU to the rack. Single points of failure designed out — not patched over after the fact.
UPS installation, battery infrastructure, and runtime calculations based on your actual critical load — sized to cover real transfer events, not best-case scenarios.
Generator connections, automatic transfer switches, and paralleling gear with the transfer time requirements mission-critical environments demand.
Modern GPU and AI/ML compute clusters pull 20–40 kW per rack. Power infrastructure designed for actual high-density workloads — not legacy 5 kW-per-rack assumptions.
CRAC and CRAH units, in-row cooling, economizers, and cooling plant electrical — coordinated with mechanical so power and cooling scale together.
Full scope

The average cost of data center downtime is $9,000 per minute — and that is before accounting for SLA violations, data corruption, reputational damage, and customer churn. Our co-founder has been on both sides of a power failure, and we design accordingly.
Technical capabilities
Process
Service area
Headquartered in Whippany, New Jersey. Multi-state licensed and insured, with crews deployed to projects anywhere in the U.S.
Industries
E-100Electrical systems for office, retail, and large-scale commercial developments.
E-200Electrical systems for healthcare, institutional, and compliance-driven facilities where reliability is critical.
E-400Electrical and low-voltage systems for cultivation, processing, and dispensary environments.
E-500Power and electrical systems for industrial facilities and utility-adjacent projects.
E-600Electrical work supporting transit, transportation, and public infrastructure environments.
Start a project
Tell us what you're working on — new build, capacity expansion, or live-facility upgrade. We'll get back to you fast with a straight answer on scope and availability.