Skip to content
Anvil EdgeElectric

Structured Cabling · Access Control · Cameras · Communications

Low Voltage Without the Extra Contractor.

Structured cabling, access control, security cameras and communications infrastructure, installed by the same contractor that runs your power, so pathways, schedules and responsibility line up.

Low Voltage, Security & Cabling

One Contractor for the Power and the Data.

When low voltage is split off to a separate contractor, pathways get missed, backboxes land in the wrong place, and no one owns the gaps. Every missed coordination item shows up as a delay or a change order.

We carry low voltage alongside the electrical scope. Pathways, backboxes and power for devices are planned together, cabling is labeled and tested, and you get one schedule and one point of accountability for everything with a wire in it.

Scope

What We Install

  • 01

    Structured cabling

    Copper and fiber horizontal and backbone cabling, terminated, labeled and certified.

  • 02

    Telecom rooms

    Racks, cable management, grounding and power for MDF and IDF rooms.

  • 03

    Access control

    Card readers, door hardware wiring, controllers and head-end connections.

  • 04

    Security cameras

    IP camera cabling, mounting and network connections.

  • 05

    Intrusion and monitoring

    Alarm and environmental monitoring devices and wiring.

  • 06

    Communications

    Paging, nurse call and intercom rough-in and cabling where specified.

Why Anvil Edge

Why Combine It With Electrical

  1. 01

    Pathways planned once

    Conduit, sleeves and cable tray sized for both systems from the start.

  2. 02

    Fewer coordination gaps

    Device power and backboxes land where the low-voltage devices need them.

  3. 03

    Tested and documented

    Cabling certified and labeled, with test results in the closeout package.

  4. 04

    Regulated facilities

    Experience with the security requirements of cannabis and healthcare sites.

Process

From Pathways to Certified Cable.

  1. 1

    Design Coordination

    Device locations and head-end requirements confirmed.

  2. 2

    Pathways

    Conduit, sleeves, tray and backboxes installed with the electrical rough.

  3. 3

    Cable Pull

    Cabling pulled, labeled and dressed.

  4. 4

    Terminate & Test

    Terminations and certification testing.

  5. 5

    Handover

    Test results, as-builts and labeling schedule delivered.

FAQ

Common questions.

Do you install security cameras and access control?

Yes. We install the cabling, devices and connections for access control and IP camera systems, and coordinate with the owner’s security integrator or IT team on programming.

Is your structured cabling tested?

Yes. Copper and fiber are tested and certified, and the results are included with closeout documentation.

Can you handle low voltage on a job where you are not the electrical contractor?

Yes, though the biggest benefit comes from carrying both scopes, because pathways and device power are coordinated in one place.

Start a project

Adding Low Voltage to the Scope?

Send the low-voltage drawings with the electrical set. We will price both together.

Office
110 S Jefferson Rd, Whippany, NJ 07981