Skip to content
Anvil EdgeElectric

New Services · Upgrades · Switchgear · Distribution

More Power. Planned Right.

New and upgraded electrical services, switchgear, transformers and distribution for commercial and industrial buildings, with the utility coordination and shutdown planning that come with them.

Service Upgrades & Switchgear

The Work Behind Every Other System.

A building outgrows its service when tenants add load, equipment gets electrified, or a use changes. Upgrading it touches everything: the utility, the owner, every tenant on the service, and the trades waiting for permanent power.

We handle the electrical side end to end. That means load calculations and design coordination with your engineer, utility applications and meetings, switchgear submittals and release, and a shutdown plan that keeps the outage as short as the work allows.

Scope

What We Install

  • 01

    New and upgraded services

    Service entrance equipment, metering and utility interconnection for new buildings and capacity increases.

  • 02

    Switchgear and switchboards

    Setting, terminating and testing main switchgear, switchboards and distribution sections.

  • 03

    Transformers

    Dry-type and pad-mount transformer installation and connections.

  • 04

    Feeders and distribution

    Main feeders, panelboards, busway and sub-distribution throughout the building.

  • 05

    Temporary power

    Temporary services and generators to keep a building or job site running during cutovers.

  • 06

    Equipment replacement

    Replacing aging or obsolete gear in occupied buildings with phased, planned outages.

Why Anvil Edge

Why It Goes Smoothly With Us

  1. 01

    Utility coordination

    We manage the utility application, meetings and scheduling so the service date holds.

  2. 02

    Long-lead planning

    Switchgear and transformer lead times are built into the schedule from day one.

  3. 03

    Planned shutdowns

    Outages are scripted, staffed and rehearsed to keep downtime short.

  4. 04

    Code-compliant installs

    Working clearances, grounding and bonding, and overcurrent protection installed to the NEC and local amendments.

Process

From Load Calc to Energized.

  1. 1

    Load & Scope

    Existing conditions, load calculations and design coordination.

  2. 2

    Utility & Submittals

    Utility application, gear submittals and release for manufacture.

  3. 3

    Rough & Set

    Conduit, pads and gear set while the building stays in service.

  4. 4

    Planned Cutover

    Scripted shutdown, terminations and utility reconnect.

  5. 5

    Test & Energize

    Testing, inspection and energization, then closeout.

FAQ

Common questions.

How long does a commercial service upgrade take?

It depends mostly on equipment lead times and the utility. We plan around both from the start and give you a realistic schedule before you commit.

Can the building stay open during the upgrade?

Usually, yes. Most of the work happens with the building energized, and the cutover is planned as a short, scheduled shutdown, often overnight or on a weekend.

Do you deal with the utility company?

Yes. We prepare and submit the utility paperwork, attend the meetings and coordinate the disconnect and reconnect.

Start a project

Need More Capacity?

Tell us what the building has today and what it needs. We will scope the upgrade and the path to get there.

Office
110 S Jefferson Rd, Whippany, NJ 07981